Proven Track Record · Pan-India EPC Delivery

Our Work Speaks for Itself

Every plant we design is engineered to solve a specific problem — compliance pressure, process water quality, energy costs, or waste. Here are some of our completed installations.

50+
Projects Commissioned
10
States Across India
2–500 KLD
Capacity Range
100%
TNPCB/CPCB Compliance Rate
Water Treatment

Industrial RO Plant — Pharmaceutical Unit

Chennai, TN 10,000 LPH

Challenge

High TDS borewell water (1800 mg/L) causing equipment scaling in API production.

Solution

2-pass Industrial RO with antiscalant dosing + DM polishing.

Outcome

Process water TDS reduced to <10 mg/L. Zero scaling incidents post-commissioning.

View Solution
Wastewater & ZLD

ZLD Effluent Treatment Plant — Textile Dyeing Unit

Tirupur, TN 50 KLD

Challenge

TNPCB Red Category notice for non-compliant discharge. 8,000 mg/L TDS dyeing effluent.

Solution

Physico-chemical ETP + MBBR biological stage + RO + MEE Evaporator.

Outcome

100% ZLD achieved. TNPCB compliance certification obtained within 90 days.

View Solution
Wastewater

Sewage Treatment Plant — Residential Apartment Complex

Mogappair, Chennai 100 KLD

Challenge

CMDA mandatory STP compliance + recycled water for flushing & gardening.

Solution

MBBR STP with tertiary filtration + UV disinfection.

Outcome

Treated water reused for 100% flushing and landscaping. CMDA NOC obtained.

View Solution
Water Treatment

Packaged Drinking Water Plant — FMCG Manufacturer

Ambattur, Chennai 2,000 LPH

Challenge

FSSAI compliance for in-house packaged water + supply chain cost reduction.

Solution

Multi-stage RO + UV + Ozone + SS 316 hygienic pipeline.

Outcome

BIS IS 14543 compliant. ₹8L/year savings vs. vendor-purchased water.

View Solution
Biogas

Biogas Plant — Food Processing Factory

Sriperumbudur, TN 500 kg/day

Challenge

High organic waste disposal cost + fuel bills for boiler.

Solution

Anaerobic digester biogas plant with gas purification + boiler integration.

Outcome

Boiler fuel cost reduced by 40%. Waste disposal cost eliminated.

View Solution
Solar

Solar Rooftop EPC — Manufacturing Plant

Sriperumbudur, TN 100 kWp

Challenge

Rising electricity bills (₹12/unit from TANGEDCO) cutting into margins.

Solution

Monocrystalline PERC panels + string inverters + net metering setup.

Outcome

₹9.5L annual savings. ROI achieved in 4.2 years.

View Solution
Wastewater

ETP for Hotel & Resort — Backwater Discharge Compliance

Mahabalipuram, TN 25 KLD

Challenge

Coastal Zone Regulation (CRZ) strict compliance for effluent near backwaters.

Solution

Extended aeration STP + sand/carbon filtration + CRZ-compliant design.

Outcome

CRZ compliance achieved. Zero discharge into sensitive coastal zone.

View Solution
Water Treatment

DM Water Plant — Boiler Feed for Textile Mill

Coimbatore, TN 5,000 LPH

Challenge

High hardness boiler feed water causing scale, frequent boiler tube failures.

Solution

Dual-bed DM plant (cation + anion exchange resins) + degasser.

Outcome

Boiler feed TDS <1 mg/L. Zero tube failures in 18 months post-installation.

View Solution

Have a similar challenge?

Let's engineer your solution.